The 32 year old throttle bodies got a little refresh and some new hoses where needed. I changed the TPS for a non fire damaged unit from the other bike, likewise a non melted plenum too.
I started to rebuild the water pump, got the new shaft pulled through on the new seals but realised I needed a new impeller bolt, which is now on order.
Got the intermediate housing on, clutch in, gearbox mounted, crank case cover installed, rocker cover installed and the started motor re-mounted.
Tomorrow I’m opening the TGPI for an inspection, Mount the airbox and hopefully get he swing arm, shock, frame, final drive etc all mounted.
I’m posting some stuff on my Instagram too, it’s the same username if you want to give me a follow - DJEwen