Nov 16 2016: After initial evaluation of the bike, following needs to be done to bring it to a mechanically perfect condition:
1. Real Axle/Final Drive splines will be rebuilt or replaced.
2. Loss of pressure in the engine cylinders. Bike will have to undergo top end engine work.
3. All seals, gaskets, wear and tear items will be replaced.
4. Front suspension will be rebuilt and shortened.
5. Front disc rear drum brake will be rebuilt.
Dec 2 2016: Final drive sent to Hansens BMW in OR for rebuilt. Hanesns will also provide a brand new drive shaft as part of the package deal. In the mean time guys from Phoenix Cycle, Dave and Steve continue to rebuild the engine.